· HOME  >  Application  >  Vessel (heavy industry) Painting Heat Dry Facility

Application

Vessel (heavy industry) Painting Heat Dry Facility

  • Vessel (heavy industry) Painting Heat Dry Facility
  • Vessel (heavy industry) Painting Heat Dry Facility
  • Vessel (heavy industry) Painting Heat Dry Facility
  • Hyundai Heavy Industry Co., Ltd. Vessel Painting facility
  • Hyundai Heavy Industry Co., Ltd. Naengcheon Logistic Center Vessel Outfit Painting facility
  • Hyundai Heavy Industry Co., Ltd. Vessel Block Painting Dry Facility
Power 220/380/440V 1~3Ph 50/60 Hz
Model Name ICE104-EWTI(Selta Standard) ICE102-EWTI(Large Object) ICE100-EWTI(Large Natural Dry Yard)
DRY UNIT 30ST 40ST 30ST
Power Consumption 120Kw 160Kw 120Kw
Painted Film Temp MAX 80℃
Irradiation Area 10000W x 12000L 10000W x 16000L 10000W x 12000L
Dry (Irradiation) Space 10000W x 12000L x3000H
(360㎥)
10000W x 16000L x3000H
(480㎥)
10000W x 12000L x3000H
(360㎥)
Wave Guide Attached 10000W x 12000L x8000H
(960㎥)
10000W x 16000L x8000H
(1280㎥)
10000W x 12000L x8000H
(960㎥)

※ Customer Tailored Manufacturing Service.

Comparison of ICE Far Infrared Dry Facility Dry Time with Natural Dry and Heat Blow facility

Dry time comparison in 4 times of painting -ICE far infrared dry facility with natural dry and heat blow dry facility-

UNIT/HOUR

  Natural Dry (A) Heat Blow Dry Facility (B) ICE far infrared dry facility (C) Variation in dry time(A-C) Remarks
0℃ 5℃ 10℃ 15℃ 0℃ 5℃ 10℃ 15℃ 0℃ 5℃ 10℃ 15℃ 0℃ 5℃ 10℃ 15℃
One time painting Amercoat 68HS Impossible 18 10 8 Impossible 15 8 6 4 4 4 4 Limitless 14 6 5 Atmosphere temperature of both heat blow dry and ICE far infrared dry are the same temperature as of the natural dry
2 times painting Amercoat 385PA 72 36 28 10 48 25 20 8 3 3 3 3 69 33 25 7
3 times painting Amercoat 385 72 36 28 10 48 25 20 8 3 3 3 3 69 33 25 7
4 times painting Amercoat 450HS 24 16 8 8 16 12 7 6 3 3 3 3 21 13 5 5
Total 168 106 74 36 112 77 55 28 13 13 13 13 Limitless 93 61 23

 

Characteristics of Facility

ICE Co., Ltd. developed the super high priced heat spreader material, the state of art product, for a normal price zone and manufactured this patented facility by using this material at the core parts, which has following characteristics.

  1. 1. Dries an object directly not heating ambient air temperature,
  2. 2. Consumes much lower level (1/4 ~ 1/5 level) of calorie (electricity) than existing dry facility does,
  3. 3. Allows heat dry possible even in out-door work site under sub zero temperature in winter,
  4. 4. Allows heat dry possible even in out-door work site under heavy rain in summer,
  5. 5. Provides special feature to lower humidity by dissolving moisture in the air without any cooling/dehumidifying process,
  6. 6. Prides in outstandingly lower power consumption than existing dehumidifying facility (1/6 ~ 1/10 level of the existing facility).
  7. 7. Shows excellent dehumidifying performance out door work site (under the marquee) in the rainy season.

Special Strong Points

Comparison of HSWG facility with Hyundai Heavy Industry Co., Ltd. existing facility.

Facility
Item
Existing Facility
(=Heat blow drying facility)
HSWG Facility
(One since 2006 and the other since 2009 have been operating in Hyundai Heavy Industry Co., Ltd., Naengcheon Logistic Center )
Dimension of dry shop 43,200㎥ (20m(Width) * 90m(Length) * 24m(Height))
Fuel cost
(1 charge: one train heat dry)
4,500,000won
2000×25×90
(Electric heater, fan capacity (kw) x 1 charge dry time(h) x electricity charges (won)
 
*Electric heat blow capacity
-2000kw
(200kW X 10Sets)
48,600won
180×3×90
(HS module capacity(kw)x 1 charge dry time(h)x electricity charges(won))
 
 
*Suggested Capacity of facility: -180 kw
Dry Time 25hours 2hours 40minutes
Pre-heat between charge Impossible (convection type) Possible
Quality after drying Convective heat transfer dries painted film first, which produces pin holes. Dry begins at the inner area of the object by electromagnetic wave, which produces no pin hole.
Work Process Arrange ->Painting ->heat dry->
cooling->discharging following to painting
Arrange ->pre-heating->painting ->
6 steps (3 hours for one step)of heat dry ->discharging following to painting
Atmosphere Environment
(Greenhouse gases Emissions)
10.75 toe/charge 0.11 toe/charge
Energy Efficiency Inefficient
(Production process is very inefficient owing to heat dry by wrapping up a vessel part pipe (1000mm) with a heat blower vinyl cover)
Excellent
(Lower energy loss thanks to Electromagnetic wave that dries inner part of the object first regardless ambient air te,perature)

HSWG heat dry system ICECO english official website

Company Name : ICE Co., Ltd.|Representative : ChoGeukrae
Busan Main Office : 31, 363-ro, Noksan Industrial Complex, Kangseo-gu, Busan
Seoul Branch Office : Manhattan 21, 13-21 Yeoido, Yeongdeungpo-gu, Seoul
TEL : Busan 051) 831–5086˜8/Seoul 02) 6333–7007.7009
FAX : 051–831–5087¸ 02–6333–7008|E–mail : ice33777@naver.com
nep gobiz